NI 43-101 - Report prepared by Valls Geoconsultant – Toronto, Ontario May 28, 2014
NI 43-101 - Report prepared by Valls Geoconsultant – Toronto, Ontario May 28, 2014

Operations:

Archut Plan - Armenia

  • Parallel system of quartz veins
  • Possible production in 2021
  • NI 43-101 technical report has been completed
  • To buy and install a processing plant (mill, gravity and floatation)
  • Time frame for plant installation 12 months at a cost of USD $2.7M
  • Operating the plant at an estimated annual net profit of $35 M.
Technical Report Drawing
Technical Report Drawing

$35m

Net profit/yr

$2.7m

Cost

12 mos

to Complete

Map
Map